Latest News

"

Time for repairs on Open60AAL

It’s Monday, let’s see how the repair is going on the Open60AAL. The team has been working on fixing the pulpit. Yet another final welding is needed to reposition the ring on the front. The painting on the bow is finished. The raging of the furling system had damaged the paint when the headsail was ripped off.

On the bowsprit, the meticulous work to replace the Gennaker and code 0 tack comes to an end. It was also damaged during the bad weather and needed to be completely replaced. The lost headsail will not be replaced until fall this year. In the meantime, the mast and the spreaders will be x-rayed to detect any potential damages.